FUNCTIONAL FEATURES
- Fire Sprinkler System
- Radiant In-Floor Heating System
- Fume Exhaust Fans with Coordinating Air Intakes
- Brick and Glass Atrium Entryway
- Large Front Apron Area for Equipment Training and Staff Meetings
- Centrally Located Radio "Watch" Room with Windows to Training and Apparatus Rooms
- (2) Bay Apparatus Room with the Ability to House Up To 14 Pieces of Equipment in Double-Stack Formation
- (2) 12" Trench Drains in Apparatus Room for Easy Wash-Down & Clean-Up
- Complete Kitchen with Appliances, Cupboards, and Snack Bar
- Suspended Ceilings, Vinyl Wallpaper, and Oak Beadboard Wainscot
- Brick Wainscot on Front & Endwalls
- Acoustical Hi-Rib Steel for Durability and Noise Suppression
|
PROJECT DELIVERY SYSTEM FEATURES
|
- Analysis of Current and Future Program Needs
- Evaluation of Budget Requirements
- Review of Building and Life Safety Codes
- Architectural, Structural, and Mechanical Plans and Specifications
- Acoustical Analysis for Most Effective Acoustical Value is Available upon Request
- Interior Layout and Selection of Life Cycle Cost Performance Components
|
|
.
Excluding Site and Site Preparation.
.
Inquiries will be served from corporate headquarters.
.
Design Team: Dan Holmes-Sales Consultant, Jeff Geske-Construction Estimator, Ron Sutton-Professional Engineer.
|
.
|
Copyright © 2007 Morton Buildings, Inc.
|