D & S Commons, LLC Veterinary Clinic in Cummings, Georgia

Project # 155-0100

  • Style # 396—42’W x 11’H x 72’L, 42’W x 11’H x 45’L, 34’W x 11’H x 8’L 
  • 42’ x 11’ x 18’ Carport with Soffit Ceiling
  • Morton Buildings’ Hi-Rib™ Steel with KYNAR 500® on Roof
  • 2-Ft. Wide Roof Overhangs with 6” Fascia and Vented Soffit on Eaves, Solid on Rake Ends
  • Exterior Sidewalls Covered with HardiPlank® Lap Siding
  • 41”-High Stone Exterior Wainscot around Front and Sidewalls
  • 6’ Square Cupolas with 25” x 44” Thermal Windows with Grids
  • Weathervanes with “Stay Bright” Copper Finish
  • Continuous Vented Ridge
  • 10’ x 7’ Insulated Sectional Overhead Door
  • Pella® Designer Series Double-Glazing Panels Installed Over Thermal Glass
  • Aluminum-Framed Exterior Entrance Doors include Sidelites and Transoms
  • (7) Kennels
  • (2) FiberSteel™ Walkdoors for Kennels
  • (4) Exam Rooms
  • Energy Performer® Insulation Package—R-19 Fiberglass in Walls, R-38 Blown-In Fiberglass in Ceiling
  • Hi-Rib™ Acoustical Steel Ceiling in Wards, Isolation and Kennel
  • (2) 30” x 30” Insulated Attic Access Doors
  • Open Porches with Open Truss Web Design and Soffit Ceiling
  • (1) FiberSteel® Out-Swing Walkdoor at Carport
  • Pergola
  • (1) Pella® French-Style, Wood-Framed Out-Swing Door at Pergola
  • Asphalt Paving for Parking Lot with Compacted Rock Base
  • Business Signage with Foundation Stonework and Lighting
  • Concrete Floor, Curbs and Sidewalks
  • Electric, Plumbing, Heating and Cooling
  • Parking Lot Markings, Accessibility Signage and Curb Stops
  • 10’ x 10’ Concrete Dumpster Containment
  • Lightning Rods
  • Gutters and Downspouts
  • Interior Doors are Steel-Framed Solid-Core Birch Veneer with Brushed Aluminum Hardware
  • Airlock Window with Thermal Glass
  • Fixed Window at Front of Office with Non-Thermal Tempered Glass
  • Plastic Laminate Installed on Three Walls in Exam Rooms, One Wall in Hallway and Underneath Benches In Waiting Area to Height of 48”
  • Concrete Trowel-Finished Surface in (2) Stock Rooms, Large Storage Room, and Mechanical Room
  • Hardwood Floors in (2) Main Offices
  • Epoxy-Paint Finish in Wards, Isolation and Kennel Area
  • Ceramic Tile Floor in all Other Rooms
  • 48”-Trim Strip in all Public Areas Only
  • Plastic Laminate-Finish Countertops
  • Benches Post-Form Countertops with Supports
  • Curved Reception Unit to Include Transaction-Top Above Desk-Height Work Surface
  • Wall-Hung Cabinetry in Lab, Pharmacy and Surgery Prep to be Shelves Only
  • Shelving Unit Between Surgery Prep and Surgery with Glass-Faced, Wood-Frame Doors on Both Sides
  • Exam Room Base Cabinets and Wall Cabinets with Doors
  • Men’s and Women’s Restrooms